Boiler Plant Replacement

Challenge Accepted

• Demo (2) 750 HP steam boilers


• Replace with (14) hot water boilers


• Install new hot water piping through 700 ft feet of existing utility tunnels


• 6-month schedule

Client
Project Type
Mechanical Infrastructure
Service Sector
Educational Institution
Challenge Met
  • McCauley performed as design-build prime mechanical contractor
  • Simplified maintenance operations
  • Payback period less than 5 years